Kyle D
c8ded77680
Kd/ci playwright go test ( #20123 )
...
* Add initial playwright config
* Simplify Makefile
* Simplify Makefile
* Use correct config files
* Update playwright settings
* Fix package-lock file
* Don't use test logger for e2e tests
* fix frontend lint
* Allow passing TEST_LOGGER variable
* Init postgres database
* use standard gitea env variables
* Update playwright
* update drone
* Move empty env var to commands
* Cleanup
* Move integrations to subfolder
* tests integrations to tests integraton
* Run e2e tests with go test
* Fix linting
* install CI deps
* Add files to ESlint
* Fix drone typo
* Don't log to console in CI
* Use go test http server
* Add build step before tests
* Move shared init function to common package
* fix drone
* Clean up tests
* Fix linting
* Better mocking for page + version string
* Cleanup test generation
* Remove dependency on gitea binary
* Fix linting
* add initial support for running specific tests
* Add ACCEPT_VISUAL variable
* don't require git-lfs
* Add initial documentation
* Review feedback
* Add logged in session test
* Attempt fixing drone race
* Cleanup and bump version
* Bump deps
* Review feedback
* simplify installation
* Fix ci
* Update install docs
2 years ago
KN4CK3R
bfe597c7b0
Use non-expiring key. ( #17984 )
3 years ago
zeripath
a730dc1419
Fix verification of subkeys of default gpg key ( #11713 )
...
* Fix verification of subkeys of default gpg key
Fix #10309
Signed-off-by: Andrew Thornton <art27@cantab.net>
* Remove debug log
* Update models/gpg_key.go
* As per @6543
Signed-off-by: Andrew Thornton <art27@cantab.net>
Co-authored-by: techknowlogick <techknowlogick@gitea.io>
5 years ago
zeripath
60b31c8f01
Fix the intermittent TestGPGGit failures ( #9360 )
...
* Fix the intermittent TestGPGGit failures
Reattempt to open the listener if the port is busy with a delay up to a second
Switch from generating a private key each time, just use a known good key
5 years ago