Use a more recent Mesa Git revision & pipeline ID.
Additionally, update the expectation files accordingly.
Signed-off-by: Cristian Ciocaltea <cristian.ciocaltea@collabora.com>
Reviewed-by: Guilherme Gallo <guilherme.gallo@collabora.com>
Acked-by: Daniel Stone <daniels@collabora.com>
Since crosvm is not able to properly handle parallel tests due to a
concurrency bottleneck, it's necessary to ensuring scaling at the host
system level by increasing the number of active crosvm instances.
For dEQP testing this can be easily accomplished by using the Deqp
Suite support in deqp-runner and adding the crosvm wrapper script in
the related '*.toml' files.
For piglit this is currently not supported in piglit-runner, but
something similar could be added later. For the moment we use an
increased number of parallel jobs to speed-up the execution.
Signed-off-by: Cristian Ciocaltea <cristian.ciocaltea@collabora.com>
Reviewed-by: Guilherme Gallo <guilherme.gallo@collabora.com>
Acked-by: Daniel Stone <daniels@collabora.com>
Fix the expectation files for all virtio-gpu jobs and enable them in the
CI pipeline.
Signed-off-by: Cristian Ciocaltea <cristian.ciocaltea@collabora.com>
Reviewed-by: Guilherme Gallo <guilherme.gallo@collabora.com>
Acked-by: Daniel Stone <daniels@collabora.com>
Temporarily disable the old CI configuration file and replace it with
the one belonging to the reworked CI infrastructure.
The project CI/CD settings should be updated in order to switch
'CI/CD configuration file' from 'ci/.gitlab-ci.yml' to the default
'.gitlab-ci.yml', for consistency with Mesa CI.
Note the 'ci/' folder becomes obsolete in favor of '.gitlab-ci/' and
could be removed once all needed functionality has been migrated to the
new setup.
Signed-off-by: Cristian Ciocaltea <cristian.ciocaltea@collabora.com>
Reviewed-by: Tomeu Vizoso <tomeu.vizoso@collabora.com>
Reviewed-by: Rohan Garg <rohan.garg@intel.com>
This doesn't do much. It would be more ideal if it could do 32-bit
builds as well.
To run deqp-vk, while there is lavapipe, lavapipe lacks external memory
that vkr requires. Some efforts will be needed to make the combination
work.
Signed-off-by: Chia-I Wu <olvaffe@gmail.com>
Reviewed-by: Gert Wollny <gert.wollny@collabora.com>
Autotools is deprecated since debb6e6ac4
It's now time to drop it definitively.
Signed-off-by: Elie Tournier <elie.tournier@collabora.com>
Reviewed-by: Gert Wollny <gert.wollny@collabora.com>
If this is not set, every fork will have to rebuild the image.
This is not what we want for at least 2 reasons:
- forks are not running the CI in the same environment than the
upstream project
- this infers bandwidth costs as every fork has its own image
that needs to be pulled by every runner.
Signed-off-by: Benjamin Tissoires <benjamin.tissoires@gmail.com>
This puts the project more in line with other projects at
freedesktop.org, and most importantly improves the caching of container
images.
Signed-off-by: Tomeu Vizoso <tomeu.vizoso@collabora.com>
v2: Fix shell handling
v3: - Use ci job template for build checks
- rename clang_fuzzer result dir
(Both suggested by Lepton Wo)
v4: - ci Unify all tests
- Fix directory (Lepton Wu)
Signed-off-by: Gert Wollny <gert.wollny@collabora.com>
Reviewed-by: Lepton Wu <lepton@chromium.org>
The GLES test suites have a rather long run time, so split the runs
for the differeent GLES versions.
Signed-off-by: Gert Wollny <gert.wollny@collabora.com>-ne
Reviewed-by: Gurchetan Singh <gurchetansingh@chromium.org>.
Currently we use echo "\n\n" which does not even print a couple of new
lines :-\
Fix that and make it slightly more indicative of what's happening.
Signed-off-by: Emil Velikov <emil.velikov@collabora.com>
Reviewed-by: Elie Tournier <elie.tournier@collabora.com>
Currently we have the exact same code for all the runtime tests. A
simple solution is to write a "generic" one and extend upon it.
This minimises the boilerplate, prevents issues like ones addressed with
earlier patch.
Signed-off-by: Emil Velikov <emil.velikov@collabora.com>
Reviewed-by: Elie Tournier <elie.tournier@collabora.com>
There is no reason to handle the test separately, at the high-level at
least.
If needed we can make the results stand out better in the [near] future.
Note: this removes the (now dead) --compare-previous. I've considered
keeping it, yet since it doesn't attribute the flip-flopping tests it's
better to remove it for now.
Signed-off-by: Emil Velikov <emil.velikov@collabora.com>
Reviewed-by: Elie Tournier <elie.tournier@collabora.com>
The logs are not neither used, nor accessible - kill them.
Signed-off-by: Emil Velikov <emil.velikov@collabora.com>
Reviewed-by: Elie Tournier <elie.tournier@collabora.com>
The logs are not neither used, nor accessible - kill them.
Signed-off-by: Emil Velikov <emil.velikov@collabora.com>
Signed-off-by: Elie Tournier <elie.tournier@collabora.com>
Missed with earlier commit.
Fixes: c203776 ("ci: split the cts jobs in two")
Signed-off-by: Emil Velikov <emil.velikov@collabora.com>
Signed-off-by: Elie Tournier <elie.tournier@collabora.com>
This avoids a potential race when multiple pipelines are running in
parallel and could update/overwrite the ':latest' tag.
For example, with two pipelines, A and B, the following could occur:
A1 -> build image and update :latest tag to digest DigestA
B1 -> build image and update :latest tag to digest DigestB
A2 -> use image from :latest tag assuming it's DigestA, but it's
actually DigestB
...
Explicitly using the image digest avoids the problem:
A1 -> build image with digest DigestA and update :latest tag
B1 -> build image with digest DigestB and update :latest tag
A2 -> use image with digest DigestA
B2 -> use image with digest DigestB
...
Signed-off-by: Alexandros Frantzis <alexandros.frantzis@collabora.com>
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Our current CI setup doesn't specify a proper dependency between the
build and test CI stages for merge requests, since the test stage jobs
are triggered on 'merge_requests' whereas the build stage jobs are not.
This leads to both build and test jobs starting in parallel for merge
requests, potentially leading to the tests running with an older docker
image.
This patch triggers the build stage jobs on 'merge_requests' ensuring
correct dependencies.
Signed-off-by: Alexandros Frantzis <alexandros.frantzis@collabora.com>
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Reduce the number of test processes run by the CI to 1/8 of the number of
available processors.
Normally only run the build and sanity checks, and only run the test suites
for merge requests.
Also fix some string marker that seems to make problems.
Signed-off-by: Gert Wollny <gert.wollny@collabora.com>
Reviewed-by: Gurchetan Singh <gurchetansingh@chromium.org>
Signed-off-by: Dave Airlie <airlied@redhat.com>
This reason for wanting to split them up is just to
provide a faster overview of what is failing and
what isn't.
This may be a small amount slower than running them
together, but the impact should be low.
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Robert Foss <robert.foss@collabora.com>
Signed-off-by: Jakob Bornecrantz <jakob@collabora.com>
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Robert Foss <robert.foss@collabora.com>
Signed-off-by: Jakob Bornecrantz <jakob@collabora.com>
Make the script names easier to remember by harmonizing the names
to use underscores instead of hyphens.
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Robert Foss <robert.foss@collabora.com>
Signed-off-by: Jakob Bornecrantz <jakob@collabora.com>
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Robert Foss <robert.foss@collabora.com>
Signed-off-by: Jakob Bornecrantz <jakob@collabora.com>
Reviewed-By: Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Robert Foss <robert.foss@collabora.com>
Signed-off-by: Jakob Bornecrantz <jakob@collabora.com>
- rename options
- switch to softpipe since it supports up to GLES 3.1
- force host GL version 4.4 because otherwise we don't get GLES 3.1 in the
guest
Reviewed-by: Gurchetan Singh <gurchetansingh@chromium.org>
Signed-off-by: Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Jakob Bornecrantz <jakob@collabora.com>
Define a CI run withing a specified docker image that uses pre-defined
versions of mesa, libdrm, and VK-GL_CTS.
The gitlab CI file .gitlab-ci.yml has been placed under ci/ in order to
avoid enabling the Ci automatically.
If the host provides a render device /dev/dri/render128D then forward
this device, use it as host device and run the dEQP GLES 2, 3, and 3.1
test suites as well as piglit by using vtest, a GL and a GLES
host context.
If this device is not available use the llvmpipe driver as host device
and run only dQEP GLES 2 with the GL and GLES host contexts.
The initial work for getting the CI running on normal hardware drivers
has been done by
Tomeu Vizoso <tomeu.vizoso@collabora.com> and
Jakob Bornecrantz <jakob@collabora.com>
Getting it to work with the llvmpipe host context was done by
Gert Wollny <gert.wollny@collabora.com>
Signed-off-by: Gert Wollny <gert.wollny@collabora.com>
Reviewed-by: Gurchetan Singh <gurchetansingh@chromium.org>
Signed-off-by: Dave Airlie <airlied@redhat.com>